首页> 外文期刊>Hydrology and Earth System Sciences >Enhancing capacities of riparian professionals to address and resolve transboundary issues in international river basins: Experiences from the Lower Mekong River Basin
【24h】

Enhancing capacities of riparian professionals to address and resolve transboundary issues in international river basins: Experiences from the Lower Mekong River Basin

机译:增强河岸专业人士解决和解决国际流域跨界问题的能力:湄公河下游流域的经验

获取原文
获取原文并翻译 | 示例
           

摘要

This paper analyses the design and impact of capacity building programmes aimed at enhancing capacities of riparian professionals to address and resolve transboundary issues in international river basins. The case study is a programme developed by the Mekong River Commission (MRC). A post-training evaluation was applied to assess its impact in terms of individual capacity enhancement and change (use and application of knowledge, factors hampering application, and change in function and opportunities within the organisation). The design of the Capacity Building Programme of the MRC Flood Management and Mitigation Programme required a well balanced range of subjects (such as IWRM (integrated water resources management), model and decision support systems, and international water law). The post-training evaluation, 6 months after the last training workshop, showed an increase in familiarity with the topics for all 37 respondents, with the highest increase for the respondents with few years of working experience and from training and education institutions. The relevance of the subjects taught was highlighted by 95% of the respondents, and 78% of the participants had already used some of the acquired knowledge in their job. The respondents indicated that they did not have sufficient opportunities to apply all knowledge. The phased implementation and training of lecturers during the training workshops had a good impact, directly through increasing involvement in facilitation and delivery of the capacity building programme and through the use of the knowledge gained in short courses and development of curricula at their institute. For these types of capacity building programmes, a few recommendations can be made. The selection of participants is crucial for the application of the learned knowledge in their work. The integrative nature of transboundary water issues calls for a capacity building programme addressing a wide range of subjects, which can be understood by a wide range of professionals from different sectors. Training methods should also address this integrative nature through, e.g. roleplays and case studies. A successful capacity building programme needs to address the three levels of capacity building (enabling environment, organisations, and individual staff) and involve national and regional training and education institutes.
机译:本文分析了旨在提高河岸专业人士解决和解决国际流域跨界问题能力的能力建设计划的设计和影响。案例研究是由湄公河委员会(MRC)开发的程序。进行了培训后评估,以评估其在个人能力增强和变化(知识的使用和应用,阻碍应用的因素以及组织内职能和机会的变化)方面的影响。 MRC洪水管理和缓解计划的能力建设计划的设计要求各个主题之间具有很好的平衡性(例如IWRM(水资源综合管理),模型和决策支持系统以及国际水法)。上次培训讲习班后六个月的培训后评估显示,所有37名受访者对主题的熟悉程度都有所提高,其中培训经验丰富且来自培训和教育机构的受访者的增幅最高。 95%的受访者强调了授课主题的相关性,而78%的参与者已经在工作中使用了一些获得的知识。受访者表示,他们没有足够的机会运用所有知识。在培训讲习班期间分阶段实施和培训讲师产生了良好的影响,这直接是通过更多地参与促进和实施能力建设计划,以及通过利用在其短期课程中获得的知识以及在其研究所制定课程而​​产生的。对于这些类型的能力建设计划,可以提出一些建议。参与者的选择对于将所学知识应用到他们的工作中至关重要。跨界水问题的综合性质要求开展能力建设方案,以解决广泛的问题,这一点可由不同部门的许多专业人员加以理解。培训方法还应通过例如角色扮演和案例研究。一个成功的能力建设计划需要解决能力建设的三个层面(有利于环境,组织和个人的工作),并需要国家和地区培训与教育机构的参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号