首页> 外文期刊>Health Physics: Official Journal of the Health Physics Society >Comparison of CAP88 PC Ver. 3.0 and MAXDOSE Dose Assessment Models Involving Co-located Stack Releases at the Savannah River Site
【24h】

Comparison of CAP88 PC Ver. 3.0 and MAXDOSE Dose Assessment Models Involving Co-located Stack Releases at the Savannah River Site

机译:CAP88 PC Ver。的比较3.0和MAXDOSE剂量评估模型涉及萨凡纳河现场的同地烟囱释放

获取原文
获取原文并翻译 | 示例
           

摘要

The Savannah River National Laboratory's Environmental Dosimetry Group performs dosimetry assessments for Savannah River Site (SRS) radionuclide air emissions utilizing the Clean Air Act Assessment Package-1988 (CAP88) code (CAP88 PC Ver. 3.0) and the MAXDOSE-SR Ver. 2011 code, which is an SRS-spedfic version of the Nuclear Regulatory Commission's MAXIGASP code. CAP88 PC and MAXDOSE-SR are used at SRS for demonstrating compliance with Environmental Protection Agency dose standards for radionuclide emissions to the atmosphere and Department of Energy Order 458.1 dose standards, respectively. During a routine comparison of these two assessment models, it was discovered that CAP88 PC Ver. 3.0 was not producing the expected results when using multiple co-located stacks in a single run. Specifically, if the stack heights are considered separately, the results for several radionuclides (but not all) differ from the combined run [i.e., 1+2 does not equal (1+2)]. Additionally, when two or more stack heights are considered in a run, the results depend on the order of the selected stack heights. For example, for a two stack-height run of O meter and 61 m input produces different results from a 61m and 0 m input run. This study presents a comparison of CAP88 PC Ver. 3.0 and MAXDOSE-SR Ver. 2011 based on SRS input data and on two-stack release scenarios.
机译:萨凡纳河国家实验室的环境剂量学小组使用《 1988年清洁空气法案》评估包(CAP88)代码(CAP88 PC版本3.0)和MAXDOSE-SR版本对萨凡纳河站点(SRS)放射性核素空气排放进行剂量学评估。 2011代码,这是核监管委员会MAXIGASP代码的SRS版本。 SRS使用CAP88 PC和MAXDOSE-SR分别证明符合美国环境保护署剂量法向大气中的放射性核素排放标准和美国能源部命令458.1。在对这两种评估模型进行例行比较时,发现CAP88 PC Ver。在一次运行中使用多个并置堆栈时,3.0版未产生预期的结果。具体来说,如果单独考虑堆高,则几个放射性核素(但不是全部)的结果与组合运行结果不同[即1 + 2不等于(1 + 2)]。此外,在运行中考虑两个或多个堆高时,结果取决于所选堆高的顺序。例如,对于O型表和61 m输入的两个堆栈高度行程,与61m和0 m输入行程产生不同的结果。这项研究比较了CAP88 PC Ver。 3.0和MAXDOSE-SR Ver。 2011年基于SRS输入数据和两叠式发布方案。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号