...
【24h】

Adapting MARSSIM for FUSRAP site closure.

机译:使MARSSIM适应FUSRAP站点关闭。

获取原文
获取原文并翻译 | 示例

摘要

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) provides a coherent, technically defensible process for establishing that exposed surfaces satisfy site cleanup requirements. Unfortunately, many sites have complications that challenge a direct application of MARSSIM. Example complications include Record of Decision (ROD) requirements that are not MARSSIM-friendly, the potential for subsurface contamination, and incomplete characterization information. These types of complications are typically the rule, rather than the exception, for sites undergoing radiologically-driven remediation and closure. One such site is the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde site in Tonawanda, New York. Cleanup of the site is currently underway. The Linde site presented a number of challenges to designing and implementing a closure strategy consistent with MARSSIM. This paper discusses some of the closure issues confronted by the U.S. Army Corps of Engineers Buffalo District at the Linde site and describes how MARSSIM protocols were adapted to address these issues.
机译:《多机构辐射调查和现场调查手册》(MARSSIM)为确定暴露的表面满足现场清理要求提供了一个连贯的,技术上可行的流程。不幸的是,许多站点的复杂性挑战了MARSSIM的直接应用。复杂的示例包括对MARSSIM不友好的决策记录(ROD)要求,潜在的地下污染以及不完整的特征信息。对于进行放射学驱动的修复和封闭的部位,这些类型的并发症通常是规则,而不是例外。这样的站点之一就是纽约Tonawanda的以前使用的站点补救行动计划(FUSRAP)Linde站点。该网站的清理工作目前正在进行中。 Linde网站对设计和实施与MARSSIM一致的封闭策略提出了许多挑战。本文讨论了林德基地布法罗地区的美国陆军工程兵团面临的一些关闭问题,并描述了如何调整MARSSIM协议来解决这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号