首页> 外文期刊>Chemistry and Technology of Fuels and Oils >Preparation of feedstock for a delayed coking unit
【24h】

Preparation of feedstock for a delayed coking unit

机译:延迟焦化装置原料的制备

获取原文
获取原文并翻译 | 示例
           

摘要

Between-servicing operation of the 21-10/3M delayed coking unit and the quality of the coke produced are determined by the quality of preparation of the feedstock.Two of the fundamental acuses of active clogging of the pipes in furnaces for thermal processing of heavy petroleum resids have been identified [1-3]:a high content of inorganic compounds in the feedstock and its low aggregate stability.
机译:21-10 / 3M延迟焦化装置的两次维修之间的操作以及所产生的焦炭的质量取决于原料的制备质量。重型热处理炉中管子主动堵塞的两个基本原因已经鉴定出石油残渣[1-3]:原料中无机化合物的含量高,其骨料稳定性低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号