...
首页> 外文期刊>World Pumps >Water & wastewater: Water handling solution delivers energy benefits
【24h】

Water & wastewater: Water handling solution delivers energy benefits

机译:水与废水:水处理解决方案可带来能源效益

获取原文
获取原文并翻译 | 示例
           

摘要

Paris is a city that is full of iconic landmarks and architectural masterpieces. The latest architectural wonder is the Paris Philharmonie concert hall, built at a cost of {EUR}390 million, it is not without its critics. We take a look at the challenges faced by KSB when considering the efficiency of the building. Situated in the Pantin Garden in an area now known as the City of Music, the new concert hall rises to a height of 37 m, and is capped by an aluminium wraparound screen some 52 m high. Spanning an area of 100 m by 330 m, the concert hall features eleven overlapping levels of different heights, nine floors and two basements. At the centre of the building is an auditorium capable of seating more than 3,200, plus there are rehearsal suites, changing rooms, meeting rooms, exhibition spaces, an educational centre, public areas, administrative offices, shops catering facilities and parking.
机译:巴黎是一个充满标志性地标和建筑杰作的城市。最新的建筑奇观是巴黎爱乐乐团音乐厅,耗资3.9亿欧元,并不是没有批评家的。在考虑建筑物的效率时,我们看看KSB面临的挑战。新的音乐厅位于如今被称为音乐之城的Pantin花园中,高度上升至37 m,并由约52 m高的铝制环绕屏遮盖。音乐厅的面积为100 m x 330 m,共有11个不同高度的重叠层,9个楼层和2个地下室。建筑物的中心是一个礼堂,可容纳3200多人,此外还有排练室,更衣室,会议室,展览室,教育中心,公共区域,行政办公室,商店,餐饮设施和停车场。

著录项

  • 来源
    《World Pumps》 |2015年第585期|共4页
  • 作者

    Alan Burrows;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 泵;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号