首页> 外文期刊>World pipelines >Take it to the (City) Limit
【24h】

Take it to the (City) Limit

机译:达到(城市)极限

获取原文
获取原文并翻译 | 示例
           

摘要

Regulatory approval of Enbridge Pipelines (Woodland) Inc.'s application for the Woodland Extension Project was granted in August 2012 by Alberta's Energy Resources Conservation Board (ERCB). At 385 km (240 miles) in total length, the oil pipeline will connect Enbridge's terminal in Northeast Edmonton with its Cheecham Terminal, located about 100 km (62 miles) south of Fort McMurray. Given the large number of road, rail, water and pipeline crossings within Edmonton's transportation utility and northeast corridors, it was decided that a segment closest to the city would be suited for pre-build construction. At approximately 13 km (8 miles), this pre-build section extends the southern portion of the Woodland Extension Project from Enbridge's Edmonton terminal, to outside the city's northeast limits. Enbridge awarded the construction contract for this pre-build segment to OJ Pipelines Canada, with construction occurring in Autumn 2013.
机译:2012年8月,艾伯塔省能源保护委员会(ERCB)批准了Enbridge Pipelines(Woodland)Inc.对Woodland扩展项目的申请的监管批准。全长385公里(240英里)的输油管道将把恩布里奇在埃德蒙顿东北部的航站楼与其位于麦克默里堡以南约100公里(62英里)的奇克汉姆终点站连接起来。鉴于埃德蒙顿的交通设施和东北走廊内有大量的公路,铁路,水和管道交叉口,因此决定最靠近城市的路段将适合于预制建筑。这个预建部分在大约13公里(8英里)处,将伍德兰扩展项目的南部部分从恩布里奇的埃德蒙顿码头延伸至城市东北边界之外。恩布里奇(Enbridge)向加拿大OJ Pipelines授予了该预建段的施工合同,施工于2013年秋季进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号