首页> 外文期刊>World Pumps >Large multistage barrel casing pumps installed on offshore Azeri oilfield
【24h】

Large multistage barrel casing pumps installed on offshore Azeri oilfield

机译:大型多级桶装泵安装在阿塞拜疆海上油田

获取原文
获取原文并翻译 | 示例
           

摘要

The Caspian Sea has long been regarded as one of the world's major reservoirs of untapped oil and gas reserves. Ever since the break-up of the Soviet Union, multinational companies and oil conglomerates have been developing the area to increase its already considerable supply to oil-hungry economies in the developed world. This ever-increasing industrialisation has lead to many lucrative supply deals for companies in the pump industry, the latest of which involves the installation of four huge new centrifugal horizontal barrel casing injection pumps, with eight separate stages, at the Azeri-Chirag-Gunashli offshore oilfield (ACG) in Azerbaijan.
机译:里海长期以来一直被认为是世界上尚未开发的油气储量的主要储层之一。自从苏联解体以来,跨国公司和石油集团一直在开发该地区,以增加其对发达世界中饥渴的经济体的大量供应。不断发展的工业化为泵行业的公司带来了许多有利可图的供应交易,最新的一笔交易是在阿塞拜疆-奇拉格-古纳什利海上安装四台新的大型离心卧式套管泵,共分八个阶段阿塞拜疆油田(ACG)。

著录项

  • 来源
    《World Pumps》 |2004年第457期|共1页
  • 作者

    Alan Burrows;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 泵;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号