首页> 外文期刊>World Oil >First well interventions by a full-catenary CT system on a DP vessel with compensated gangway
【24h】

First well interventions by a full-catenary CT system on a DP vessel with compensated gangway

机译:全井CT系统在带补偿舷梯的DP船上进行的第一口井干预

获取原文
获取原文并翻译 | 示例
           

摘要

An offshore operator in Brunei faced the challenge of increasing the injectivity in waterflooded fields, to improve hydrocarbon production. The solution chosen to achieve the injection targets involved the use of a stimulation vessel with coiled tubing (CT), nitrogen and the pumping capability to perform well interventions. The operation faced challenging offshore weather conditions, limited platform access, a lack of crane facilities and an aging offshore infrastructure. It also had to provide an emergency disconnect system, while simultaneously improving operational efficiency.
机译:文莱的一家海上作业者面临着增加注水油田的注入量以提高油气产量的挑战。为实现注入目标而选择的解决方案包括使用具有连续油管(CT),氮气和增产能力的增产容器。该业务面临严峻的海上天气条件,有限的平台通道,缺乏起重机设施以及老化的海上基础设施。它还必须提供紧急断开系统,同时提高运营效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号