首页> 外文期刊>World Oil >Simultaneous hydrate and paraffin treatment at a subsea Gulf of Mexico development
【24h】

Simultaneous hydrate and paraffin treatment at a subsea Gulf of Mexico development

机译:在墨西哥湾海底开发中同时进行水合物和石蜡处理

获取原文
获取原文并翻译 | 示例
           

摘要

A subsea development in the Gulf of Mexico was experiencing flow assurance challenges due to both hydrate and paraffin formation. The basic field architecture comprised three satellite dry-tree wells (Satellites 1, 2 and 4) that were flowed via relatively shallow subsea flowlines to a host processing facility where production was commingled with that of platform wells. The incumbent chemical treatment comprised injection of 20 gal/day of a thermodynamic hydrate inhibitor at Satellite 1, 275 gal/day of an aliphatic paraffin solvent at Satellite 4 and an additional 20 gal/day of paraffin solvent at the production facility. Even with these incumbent treatments, hydrate plugging occurred in the Satellite 1 subsea flowline, and the Satellite 4 flowline experienced precipitation of mixed paraffin and hydrates.
机译:由于水合物和石蜡的形成,墨西哥湾的海底开发正面临流量保证方面的挑战。基本的现场架构包括三个卫星枯树井(卫星1、2和4),这些井通过相对较浅的海底流水线流入主机处理设施,在这里,其生产与平台井的生产相混合。现有的化学处理方法包括在卫星1注入20加仑/天的热力学水合物抑制剂,在卫星4注入275加仑/天的脂肪族石蜡溶剂,在生产设施额外注入20 gal /天的石蜡溶剂。即使采用了这些现有的处理方法,在Satellite 1海底管线中仍发生水合物堵塞,并且Satellite 4流水线中出现了混合石蜡和水合物的沉淀。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号