THE GOTTHARD ALPTRANSIT TUNNEL

机译:戈达尔高空隧道

获取原文
获取原文并翻译 | 示例
       

摘要

The concept of building the Gotthard base tunnel is not new. It was first proposed as early as 1947. Now over 50 years after the first major proposal for the site in 1962, the world's longest railway tunnel has a final design and is under construction. The new Gotthard rail tunnel is the most ambitious of the Alptransit projects with a length of 57km between Erstfeld and Bodio, as well as requiring an 800m deep subvertical shaft at Sedrun in the middle of the alignment in order to excavate the central section of the tunnel. The study group for the Gotthard tunnel of the Swiss Federal Department of the Interior produced the first project plan in 1962 for a base tunnel through the Gotthard region. The project comprised a single tube tunnel, connected through two intermediate headings, on a straight line between Amsteg and Giornico. The routing was 47km long with a passing track facility in the central section of the tunnel. The intention was for trains to travel through at maximum speed of up to 200km/h, which was not far from that of present day trains.
机译:建造Gotthard基础隧道的概念并不新鲜。它最早是在1947年提出的。自1962年首次提出重大建议以来,至今已有50多年了,世界上最长的铁路隧道已完成最终设计并正在建设中。新的Gotthard铁路隧道是Alptransit项目中最雄心勃勃的项目,在Erstfeld和Bodio之间的长度为57公里,并且在路线中部需要在Sedrun处有一个800m深的竖井,以便开挖隧道的中心部分。 。瑞士内政部Gotthard隧道研究小组于1962年制定了第一个通过Gotthard地区的基础隧道的项目计划。该项目包括一条通过两个中间钻头连接的单管隧道,位于Amsteg和Giornico之间的一条直线上。路线全长47公里,在隧道的中部设有过往的轨道设施。目的是使火车以最高时速200公里/小时的速度行驶,这与当今的火车相距不远。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号