首页> 外文期刊>World Gas Intelligence >Cove Point Supply Shifts
【24h】

Cove Point Supply Shifts

机译:湾点供应变化

获取原文
获取原文并翻译 | 示例
       

摘要

The 2006 outlook for supply into the Cove Point,Maryland,US LNG terminal is hazy,as two of the main capacity holders have yet to announce new contracts,even as the old ones are coming to an end.BP - which like Statoil and Royal Dutch Shell holds 250 million cubic feet per day (1.9 million tons per year) of capacity at Cove Point - looks to be the facility's stalwart supplier at the moment,as its production from Trinidad and Tobago's Atlantic LNG Train 4 has finally reached full levels after months of delay and start-up hitches (WGI Jan.ll,pl).
机译:2006年,美国LNG码头的Cove Point的供应前景一片朦胧,因为其中两个主要产能持有者尚未宣布新合同,即使旧合同即将到期。BP-Statoil和Royal荷兰壳牌公司在Cove Point每天拥有2.5亿立方英尺(每年190万吨)的产能-目前看来是该设施的坚定供应商,因为特立尼达和多巴哥的大西洋LNG火车4的生产在数月的延迟和启动故障(WGI Jan.ll,pl)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号