WATER & ENERGY INTERNATIONAL: Energy Section - Requirement of Equipments at Generating Stations during 12th Plan and Beyond

机译:国际水能与能源部:能源部-“十二五”期间及之后的发电站设备要求

获取原文
获取原文并翻译 | 示例
           

摘要

Electricity is a vital input for economic and social development of our society. Our economy is growing at a rapid rate and adequate and quality power is essential to fuel this growth. To meet the growing demand of the country and the Government's Endeavour to improve the living standard of our people.CEA has carried out planning studies to estimate the capacity addition required during the 12th and 13th Plans. For the purpose of assessing the requirement of equipment, coal/lignite based Thermal Plants have been categorized based on their Unit sizes. Requirement of equipment for Gas/ LNG based plants have been assessed based on the typical requirement of a module. Requirement of Hydro Plants has been assessed for each project, as equipment required,are site specific. Requirement of equipment for Nuclear Plants has not been included as it is expected that Nuclear Power Corporation of India would separately ensure development of production capability for material and equipment commensurate with their requirement during prospective plans.
机译:电力是社会经济和社会发展的重要投入。我们的经济正在快速增长,充足而优质的力量对于推动这一增长至关重要。为了满足该国日益增长的需求以及政府为改善我国人民的生活水平所作的努力。CEA进行了规划研究,以估算“十二五”和“十三五”期间所需增加的能力。为了评估设备的需求,基于煤/褐煤的热电厂已根据其机组规模进行了分类。基于模块的典型要求,对基于天然气/液化天然气的工厂的设备要求进行了评估。已针对每个项目评估了水力发电厂的需求,因为所需设备是特定于现场的。未包括对核电站设备的要求,因为预计印度核电公司将分别确保在预期计划期间开发与其需求相称的材料和设备的生产能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号