REMOVAL OF CONCRETE PLUG FROM DRAFT TOBE VENTS OF POWER HOUSE - INDIRA SAGAR PROJECT

机译:从电站拟通风口拆除混凝土堵头-迪迪拉蔗糖工程

获取原文
获取原文并翻译 | 示例
           

摘要

In the power house concrete plug of m 20 grade was placed in draft Tube Vent of Unit#6 to protect the power house from flooding of water from tail pool side. The volume of concrete placed in the three vents of draft tube plug was 447m~3. The concreteplug was removed by using hydraulic splitters, Jack hammer alongwith RCC cutting torch. The work mentioned above has been executed in extremely difficult condition with heavy seepage of water and ventilation problem. RCC cutting torch alongwith hydraulicsplitters combination were used for the breaking the concrete which was a unique experiment and the same helped us in fast removal of rich concrete. The technique used was non blasting technique as the power house was in operation and care had to be taken so that O&M of the power house was not affected.
机译:在动力室中,将m 20级的混凝土塞子插入6号机组的通风管中,以保护动力室免受尾池侧水的浸入。引流管塞三个通气孔内的混凝土体积为447m〜3。使用液压劈裂机,杰克锤和RCC割炬将混凝土塞移除。上述工作在极其困难的条件下进行,有大量渗水和通风问题。 RCC割炬与液压分流器组合用于破碎混凝土,这是一个独特的实验,同样帮助我们快速去除了丰富的混凝土。所使用的技术为非爆破技术,因为动力室正在运行,因此必须小心操作,以免影响动力室的运维。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号