首页> 外文期刊>Water and Energy International >REHABILITATION AND RESETTLEMENT OF PROJECT AFFECTED FAMILIES IN INDIRA SAGAR PROJECT OF MADHYA PRADESH ON NARMADA RIVER
【24h】

REHABILITATION AND RESETTLEMENT OF PROJECT AFFECTED FAMILIES IN INDIRA SAGAR PROJECT OF MADHYA PRADESH ON NARMADA RIVER

机译:纳尔达达河上玛迪娅·帕德什的靛蓝琼脂项目中受影响项目的修复和重新安置

获取原文
获取原文并翻译 | 示例
           

摘要

It is universally accepted fact that hydroelectricity is the cheapest and non polluting source of energy. So, every state and every country wants to harness their water resources for generation of electricity to meet their power demand. The biggest hindrance in the path of this energy is rehabilitation and resettlement of people, who are being affected due to submergence in the reservoirs of such hydroelectric projects. The rehabilitation and resettlement of project affected people is a very sensitive subject and needs to be handled very carefully and with utmost human angle. In mega projects like Indira Sagar project in Madhya Pradesh, the issue of rehabilitation and resettlement becomes still more sensitive and serious because the number of people involved in this process is quite high. In a democratic country like India and in the present age of human rights and transparency, this job needs to be handled very delicately.
机译:水力发电是最便宜且无污染的能源,这已被普遍接受。因此,每个州和每个国家都希望利用其水资源来发电,以满足其电力需求。这种能源路径上的最大障碍是人们的康复和重新安置,这些人由于此类水力发电项目的水库淹没而受到影响。受项目影响的人们的康复和安置是一个非常敏感的主题,需要非常谨慎地对待,必须以最大的角度。在诸如中央邦的英迪拉·萨加尔(Indira Sagar)项目这样的大型项目中,由于涉及这一过程的人数很多,因此恢复和安置问题变得更加敏感和严重。在像印度这样的民主国家以及当今人权和透明的时代,这项工作需要非常精细地处理。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号