GENERATOR AND AUXILIARIES OF CHAMERA HYDROELECTRIC PROJECT STAGE-II - AN OVERVIEW

机译:美洲驼水电项目第二阶段的发电机和辅助设备-概述

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Commissioning of a large hydroelectric project which has substantial volume of underground works is a challenge. Generator and bus duct are very important items and require integration with other equipments and on-going civil works. The engineering ofgenerator, bus duct and excitation system (approximately 20 % of E&M cost) was carried out expeditiously and supplies were ensured in time. This paper deals with many features of generator, bus duct and excitation system with respect to design, erection, testing and commissioning. The difficulties experienced and action taken to solve them are an experience by itself. Authors have made an effort to give a lucid picture of these three items as an experience. It is expected that future projects would bebenefited with this effort not only in this company but world-wide.
机译:调试具有大量地下工程的大型水力发电项目是一个挑战。发电机和母线槽是非常重要的项目,需要与其他设备集成和进行中的土建工程。发电机,母线槽和励磁系统的工程设计(约占机电成本的20%)迅速进行,并确保了及时供应。本文从设计,安装,测试和调试方面论述了发电机,母线槽和励磁系统的许多特征。经历的困难和为解决这些困难所采取的行动本身就是一种经历。作者已经尝试对这三个项目进行了清晰的了解。期望不仅在该公司而且在世界范围内,将来的项目都将受益于此努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号