首页> 外文期刊>Water Science and Technology >Technical and economical analysis of the conversion of a full-scale scrubber to a biotrickling filter for odour control
【24h】

Technical and economical analysis of the conversion of a full-scale scrubber to a biotrickling filter for odour control

机译:将全尺寸洗涤塔转换为生物滴滤池以控制气味的技术和经济分析

获取原文
获取原文并翻译 | 示例
           

摘要

The present paper evaluates the technical and economical feasibility of converting wet chemical scrubbers to biotrickling filters for H2S control at the Orange County Sanitation District (OCSD), California. Results of 8 months of continuous operation of a biotrickling filter treating 16,000 m(3) h(-1) of foul air are analyzed. The reactor was operated at a gas contact time of 1.6 to 2.2 seconds reaching H2S elimination capacities up to 105-110 g H2S m(-3) h(-1), consistently maintaining outlet concentrations well below the regulatory limits (24 h average of 1 ppm(v)) and demonstrating to be very robust against temporary changes. Also, a cost-benefit analysis of the conversion was performed. Savings from chemicals, energy and water usage compared to a chemical scrubber operated in parallel to the biotrickling filter throughout the project indicated that the payback time of the conversion was about 1.3 years. Cost savings ranged between US
机译:本文评估了在加利福尼亚州奥兰治县卫生区(OCSD)将湿式化学洗涤塔转化为生物滴滤池以控制H2S的技术和经济可行性。分析了连续8个月的生物滴滤池处理16,000 m(3)h(-1)的空气的结果。该反应器在1.6至2.2秒的气体接触时间下运行,达到H2S消除能力高达105-110 g H2S m(-3)h(-1),始终保持出口浓度远低于法规限制(24小时平均值) 1 ppm(v)),证明对临时更改非常有力。另外,进行了转换的成本效益分析。与在整个项目中与生物滴滤池并行运行的化学洗涤器相比,化学,能源和水的使用节省了资金,这表明转化的投资回收期约为1.3年。节省的成本在美国之间

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号