首页> 外文期刊>Water Science and Technology >Kappala 2001 - upgrading and expansion of the Kappala Wastewater Treatment Plant: project management
【24h】

Kappala 2001 - upgrading and expansion of the Kappala Wastewater Treatment Plant: project management

机译:Kappala 2001-Kappala废水处理厂的升级和扩建:项目管理

获取原文
获取原文并翻译 | 示例
           

摘要

Kappala Association has the responsibility to receive and treat wastewater from 11 municipalities situated just north of Stockholm in Sweden. Running a tunnel system, 60 km long, and a treatment plant meet this responsibility. The Association was formed in 1957 and the tunnel system and the Kappala plant were taken into operation in 1969. The plant is situated in Lidingo, northeast of Stockholm. The load will in 1999 correspond to nearly 500,000 p.e. The plant built in the sixties was running until the 31 March 1998 when a new part was taken into operation. During 1998-1999 the old part will be upgraded and the expanded and upgraded Kappala plant will run under ordinary conditions in the year 2001. The expansion was decided on the basis of improvement on four points namely: 1. Capacity improvement The design year is 2020 and the estimated load will then correspond to about 700,000 p.e. The design load of the old part is 500,000 p.e. 2. Nitrogen removal. The Swedish Parliament specified in 1990 that at least 50% nitrogen removal should be achieved in the major treatment plants in Sweden. 3. Working conditions. Since the plant is housed in the Kappala rock special demands must be put on the working environment. The demands have increased during the years and the environment had to be improved substantially. 4. Odour. Complaints about odour among neighbors have long been a hot issue in Lidingo and the need for improvement was highly desirable. Also along the tunnel-system there were complaints about odour. The decision to expand the plant was taken by the owners, nine municipalities in 1993 and the necessary permit from the National Licensing Board for Environment Protection was received in December 1993. The basis for the application to the Licensing Board was a principal design proposal. In this proposal, which was approved by the authorities, the overall treatment process design was determined. [References: None]
机译:卡帕拉协会负责接收和处理位于瑞典斯德哥尔摩北部的11个城市的废水。运行一个长60公里的隧道系统和一个污水处理厂即可履行这一职责。该协会成立于1957年,隧道系统和Kappala工厂于1969年投入运营。该工厂位于斯德哥尔摩东北部的Lidingo。 1999年的负荷将相当于近500,000 p.e.建于60年代的工厂一直运行到1998年3月31日,当时新的部件投入运行。在1998-1999年期间,将对旧部分进行升级,并将在2001年在正常条件下运行扩建和升级的Kappala工厂。扩建是基于以下四个方面的改进而决定的:1.产能提高设计年为2020然后估计的负载将相当于大约700,000 pe旧零件的设计负荷为500,000 p.e. 2.脱氮。瑞典议会在1990年明确规定,瑞典的主要污水处理厂应至少去除50%的氮。 3.工作条件。由于工厂位于Kappala岩石中,因此必须对工作环境提出特殊要求。这些年来,需求增加了,必须大大改善环境。 4.气味。邻居之间关于气味的投诉长期以来一直是利丁戈的热门话题,非常需要改进。同样在隧道系统中,也有关于异味的投诉。所有者,1993年的9个市政当局做出了扩建该工厂的决定,并于1993年12月获得了国家环境保护局的必要许可。向许可委员会申请的依据是一项主要设计建议。在该建议书中,经当局批准,确定了整个处理过程的设计。 [参考:无]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号