首页> 外文期刊>VGB PowerTech >Individual Components of the Coal Firing Systems with Fluidised Beds and their Influence on the Downtime and Maintenance of Energy Conversion Equipment
【24h】

Individual Components of the Coal Firing Systems with Fluidised Beds and their Influence on the Downtime and Maintenance of Energy Conversion Equipment

机译:流化床燃煤系统的各个组成部分及其对停机时间和能量转换设备维护的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The SKO-ENERGO Co. in Mlada Boleslav put online in the autumn of 1998 two coal-fired boilers with circulating fluidised bed. The output of the boilers in question is 140 tonnes of hot steam per hour. The boilers were jointly delivered by the consortium of the two companies, namely ALSTOM and VITKOVICE. To this day, the boilers have been in operation for about 28,000 hours. The following paper deals with the history of origin, development and solutions of several operational problems that have been encountered during the period of boilers' service.
机译:姆拉达·博莱斯拉夫(Mlada Boleslav)的SKO-ENERGO公司于1998年秋天将两台带有循环流化床的燃煤锅炉投入使用。该锅炉的产量为每小时140吨热蒸汽。这些锅炉是由阿尔斯通和VITKOVICE两家公司联合交付的。迄今为止,这些锅炉已经运行了约28,000小时。以下文章介绍了锅炉使用期间遇到的一些运行问题的起源,发展和解决方案的历史。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号