首页> 外文期刊>VGB KraftwerksTechnik >Operational experience with the waste heat boilers of the gas and steam installation in the district heating power station Dresden-Nossener Bruke
【24h】

Operational experience with the waste heat boilers of the gas and steam installation in the district heating power station Dresden-Nossener Bruke

机译:德累斯顿·诺瑟纳·布鲁克(Dresden-Nossener Bruke)区域供热电站燃气和蒸汽装置余热锅炉的运行经验

获取原文
获取原文并翻译 | 示例
           

摘要

Today, Dresden is covering just under half of the total heat requirements by district heating, 95% of which come from heating and refuse incineration and heating power stations. The location of new gas-cycle power station at the intersection of the big long-distance heating lines is near the center if the town. The district heating power station Dresden-Nossener Brucke was conceived for base-load operation and, thanks to its flexible design, is capable of supplying the city's networks with about 85% of its requirements of electric energy and district heating in gas and steam operation. For an adequate supply with a high rate of fuel utilization the waste-heat boilers were designed in such a way as to be usable in five different operating modes.
机译:如今,德累斯顿的区域供暖系统仅能满足总供热需求的将近一半,其中95%来自供热,垃圾焚烧和热力发电厂。新的燃气循环发电站位于大型长途供热线交叉点的位置,如果在城镇附近。德累斯顿-诺森纳·布鲁克(Dresden-Nossener Brucke)区域供热电站被设计用于基本负荷运行,并且由于其灵活的设计,能够为城市的网络提供约85%的电能和天然气和蒸汽运行中的区域供热需求。为了提供充足的燃料并提高燃料利用率,废热锅炉的设计可在五种不同的运行模式下使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号