...
首页> 外文期刊>VGB KraftwerksTechnik >Siemens optimizes start-up sequences in a power plant unit new unit start-up simulator reduces costs
【24h】

Siemens optimizes start-up sequences in a power plant unit new unit start-up simulator reduces costs

机译:西门子优化了发电厂单元中的启动顺序新的单元启动模拟器降低了成本

获取原文
获取原文并翻译 | 示例
           

摘要

Start-up sequences in a power plant unit are very complicated and complex processes which involve the interaction of a large number of components that feature highly varying dynamic behaviour. Thick-walled components have a major impact here due to their thermal inertia.
机译:发电厂单元中的启动程序非常复杂,过程复杂,涉及大量具有动态变化行为的组件之间的相互作用。厚壁部件由于其热惯性而在此处产生重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号