首页> 外文期刊>Valve World >Meeting extreme challenges through unique technology
【24h】

Meeting extreme challenges through unique technology

机译:通过独特的技术应对极端挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Rotary Gate Valve provides ideal solution to long distance tie-back to shore subsea gas/condensate field developments. There are very few genuine new developments in the valve world, new ideas are mostly developed along a theme, however, one completely new concept in valve design is the Rotary Gate Valve (RGV) developed by Weir Valves & Controls UK Ltd. - a part of the Weir Power & Industrial Division in the UK. The rotary gate valve has been successfully supplied to FMC StatoilHydro for the Ormen Lange project in Norway where there was a particular problem in controlling regenerated Mono Ethylene Glycol (MEG) injection to prevent hydrate formation. Subsea equipment has been supplied for over 25 years, with more and more discoveries being declared viable in deep and ultra deep waters. The Ormen Lange project, situated off the North-western coast of Norway, was developed in water depths of I 100 m on the edge of the Arctic Circle and has an ambient sea temperature which can reach -2℃. Gas produced from the field contains entraine' water that, if left untreated, would form hydrate and potentially block up the process lines. Gas from the Ormen Lange project is piped to an onshore terminal, which is 120 km from the subsea template In Australia, GE Oil & Gas has used the valve for Chevron's Gorgon and Jansz fields, the most significant gas projects to date for this region. Valves were specified with the specific flow requirements for the fields and the physical layout of the choke module designed by GE Oil & Gas.
机译:旋转闸阀为远程回输到岸上海底天然气/凝析气田开发提供了理想的解决方案。阀门领域几乎没有真正的新发展,新的想法大多是围绕一个主题发展的,但是,阀门设计中的一个全新概念是英国威尔阀门与控制有限公司开发的旋转闸阀(RGV)-一部分英国威尔电力与工业部的代表。旋转闸阀已成功提供给FMC StatoilHydro,用于挪威的Ormen Lange项目,该项目在控制再生单乙二醇(MEG)注入以防止水合物形成方面存在特殊问题。水下设备的供应已超过25年,越来越多的发现被宣布可用于深水和超深水域。位于挪威西北海岸的Ormen Lange项目是在北极圈边缘水深100 m处开发的,环境海水温度可达-2℃。田间生产的气体包含夹带的水,如果不处理,它们会形成水合物并可能阻塞生产线。来自Ormen Lange项目的天然气被输送到离海底模板120公里的陆上码头。在澳大利亚,GE石油天然气公司已将该阀用于雪佛龙Gorgon和Jansz油田,这是该地区迄今为止最重要的天然气项目。根据GE Oil&Gas设计的节流阀模块的领域和物理布局,为阀门规定了具体的流量要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号