首页> 外文期刊>Turbomachinery International >THE CHANGING ROUE OF THE GAS TURBHE
【24h】

THE CHANGING ROUE OF THE GAS TURBHE

机译:燃气轮机的变化路线

获取原文
获取原文并翻译 | 示例
       

摘要

AS USERS BEGIN TO CYCLE THEIR TURBINES MORE AND OPERATE WITH MORE STARTS PER YEAR, MAINTENANCE PATTERNS MUST BE ADJUSTED. For almost 25 years, Strategic Power Systems, Inc. (SPS) has been gathering data on gas and steam turbines in a worldwide database known as ORAP (Operational Reliability Analysis Program). Beginning in the last quarter of 2010 SPS, working with multiple pilot partners, has also begun the collection of wind turbine data, laying the foundation for its ORAP for Wind product introduction. Participating plants include turbine technology from Alstom, GE, Mitsubishi, Rolls Royce, Pratt & Whitney and Siemens. "We strive to attain a statistically significant percentage of the total fleet for each type of turbine so we can represent the market accurately," says Tom Christiansen, Senior Vice President at SPS. "We have participants from all around the world."
机译:随着用户开始越来越多地使用它们的涡轮机,并且每年开始使用更多新的设备,必须调整维护方式。在将近25年的时间里,Strategic Power Systems,Inc.(SPS)一直在称为ORAP(运营可靠性分析计划)的全球数据库中收集有关燃气轮机和蒸汽轮机的数据。从2010年最后一个季度开始,SPS与多个试点合作伙伴合作,也已开始收集风力涡轮机数据,为引入ORAP引入风力产品奠定了基础。参与的工厂包括来自阿尔斯通,通用电气,三菱,劳斯莱斯,普惠和西门子的涡轮技术。 SPS高级副总裁Tom Christiansen说:“我们努力使每种类型的涡轮机在统计上占总机队的比例很高,以便我们能够准确地代表市场。” “我们有来自世界各地的参与者。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号