USER CERTIFIED: 59.1% EFFICIENCY - MITSUBISHI'S M701G2 GAS TURBINES POWER A NEW COMBINED CYCLE PLANT IN JAPAN

机译:用户认证:59.1%的效率-三菱的M701G2燃气轮机为日本的新型联合循环电厂提供动力

获取原文
获取原文并翻译 | 示例
           

摘要

Tokyo Electric Power Company's (TEPCO) Kawasaki Thermal Power Station Group 1 is an advanced combined cycle, featuring Mitsubishi's steam-cooled M701G2 gas turbine (Figures 1,2). The combined cycle is a part of a project to replace a conventional six-unit steam plant of 1,050 MW that has supplied power to the Tokyo metropolitan area for over 40 years. Eventually, 1,050 MW of steam power will be replaced by 3,000 MW of combined cycle power (Figure 3). The new combined cycle consists of three single-shaft blocks of 500 MW. This is the first commercial application of the 334 MW M701G2. In hot condition, the single-shaft blocks can reach full load in 50 minutes from ignition. The combined cycle has demonstrated 59.1% efficiency (LHV) under site conditions, says Ryuta Kawakami, Deputy Manager at TEPCO's Thermal Power Plant Engineering Center.
机译:东京电力公司(TEPCO)的川崎热电站1组是一种先进的联合循环,具有三菱的蒸汽冷却M701G2燃气轮机(图1,2)。联合循环是一个项目的一部分,该项目将替换传统的六单元式蒸汽发电厂,功率为1050兆瓦,该发电厂已为东京都会区供电40多年。最终,将由3,000 MW的联合循环功率代替1,050 MW的蒸汽功率(图3)。新的联合循环包括三个500 MW的单轴模块。这是334 MW M701G2的首次商业应用。在高温条件下,单轴块可在点火后50分钟内达到满负荷。东京电力公司热电厂工程中心副经理Ryuta Kawakami说,联合循环在现场条件下显示出59.1%的效率(LHV)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号