PQSpotlight STATCOM Postpones the Need for 161-Kv Line - Load growth and known voltage problems prompt TVA to install reactive compensation to defer a new 50-mile transmission line

机译:PQSpotlight STATCOM推迟了对161kV线路的需求-负载增长和已知的电压问题促使TVA安装无功补偿以推迟一条新的50英里输电线路

获取原文
获取原文并翻译 | 示例
       

摘要

Leake is a 161/46/13.2-kV substation located close to the southern border of the Tennessee Valley Authority (TVA; Knoxville, Tennessee, U.S.) supply area in Mississippi (U.S.), serving the Central EPA distribution company at 46 kV and 13.2 kV. In 2001, the area peak load of 130 MW had load growth estimated at 4.1% per year. Studies by TVA's bulk transmission planning group indicated the Leake area was susceptible to voltage problems. Possible remedial measures included a near-term plan to rebuild and convert the Leake-Sebastopol-Lake 46-kV line to 161 kV, and a long-term plan for a new 50- to 60-mile (80- to 97-km) 161-kV line from the Red Hills Generating Station to Leake Substation.
机译:Leake是一个161/46 / 13.2-kV变电站,位于美国密西西比州的田纳西河谷管理局(TVA;美国田纳西州诺克斯维尔)供电区域的南部边界附近,以46 kV和13.2为中央EPA配电公司服务。千伏。 2001年,该地区的130 MW高峰高峰负荷的年增长率估计为4.1%。 TVA大容量传输计划小组的研究表明,Leake地区易受电压问题的影响。可能的补救措施包括将Leake-Sebastopol-Lake 46-kV线路重建并将其转换为161 kV的近期计划,以及新的50至60英里(80至97公里)的长期计划。从Red Hills发电站到Leake变电站的161 kV线路。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号