【24h】

Radical Reliability Improvement

机译:根本可靠性的提高

获取原文
获取原文并翻译 | 示例
           

摘要

Georgia Transmission's attention to lightning design virtually eliminates momentary outages. Over the last 14 years, Georgia Transmission Corp. (GTC) has been working to reduce its momentary average interruption frequency index (MAIFI). In 1997, its overall MAIFI was about two momentary outages per consumer per year, with about 10 on the worst-performing line. Today, the company-wide MAIFI is less than TO and has decreased from 10 to one on that troublesome line.
机译:Georgia Transmission对防雷设计的关注实际上消除了瞬时中断。在过去的14年中,乔治亚州传输公司(GTC)一直在努力降低其瞬时平均中断频率指数(MAIFI)。 1997年,其总体MAIFI约为每个消费者每年两次瞬时中断,其中约10个是性能最差的中断。如今,公司范围内的MAIFI小于TO,并且已从这一麻烦的线路上的10减少到1。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号