...
【24h】

MODULAR SUBSTATION APPROACH IS WORKING WELL AT POWERLINK QUEENSLAND

机译:昆士兰州POWERLINK的模块化置换方法运行良好

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Integrated design improves transmission performance by enhancing reliability and reducing maintenance costs. POWERLINK QUEENSLAND is an Australian government-owned corporation that owns, operates, develops and maintains one of the world's longest and most reliable, extra-high-voltage (EHV) and high-voltage (HV) electric-ity transmission networks. This sophisticated USD3 billion (USD2.3 billion) network extends more than 1700 km (1056 miles) from the New South Wales border in the south to beyond Cairns in the tropical north of Queensland, or over approximately half of Australia's eastern seaboard. This network includes 96 Powerlink substations, all operated from a single control center in Brisbane.
机译:集成设计通过增强可靠性和降低维护成本来改善传输性能​​。 POWERLINK QUEENSLAND是澳大利亚政府所有的公司,拥有,运营,开发和维护世界上最长,最可靠的超高压(EHV)和高压(HV)电力传输网络之一。这个复杂的30亿美元(23亿美元)网络从南部的新南威尔士州边界延伸1700多公里(1056英里),延伸至昆士兰州热带北部的凯恩斯以外,或澳大利亚东部沿海地区的一半以上。该网络包括96个Powerlink变电站,所有变电站均由布里斯班的一个控制中心操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号