首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Pre-Kitted Hardware: A Packaged Deal With Chugach Electric's line rebuild in Alaska's extreme conditions, not having to keep track of hardware allowed the cooperative to focus on construction issues
【24h】

Pre-Kitted Hardware: A Packaged Deal With Chugach Electric's line rebuild in Alaska's extreme conditions, not having to keep track of hardware allowed the cooperative to focus on construction issues

机译:预先安装的硬件:在阿拉斯加的极端条件下与Chugach Electric进行的线路重建打包交易,无需跟踪硬件,这使合作社可以专注于施工问题

获取原文
获取原文并翻译 | 示例

摘要

Every thing in Alaska is more extreme: the wildlife, the weather and the challenges of building transmission lines. During the 2012-2013 winter, Chugach Electric Association rebuilt a 115-kV wood-pole transmission line. It was the first time the cooperative had used pre-kitted hardware and it worked very well. While most utilities do not have to work under such extreme conditions, Chugach found the advantages of having all the hardware for each pole in one package would benefit any project.
机译:阿拉斯加的每一件事都更加极端:野生动物,天气和修建输电线路的挑战。在2012-2013年冬季,楚加奇电气协会重建了一条115 kV木杆输电线路。这是合作社第一次使用预先安装的硬件,并且效果很好。尽管大多数公用事业公司不必在这样的极端条件下工作,但Chugach发现,将每个杆的所有硬件都装在一个封装中的优势将使任何项目受益。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号