Solid-Dielectric ACR Installation Improves Distribution Network Reliability

机译:固态电介质ACR安装可提高配电网络的可靠性

获取原文
获取原文并翻译 | 示例
       

摘要

With the increase in demand for high-reliability power supply to Fiji Electricity Authority's (FEA) customer base, FEA purchased an initial 20 OSM Recloser units for installation mainly on the rural spurs of several distribution feeders. Offering a circuit exposure of more than 1000 km (621 miles), these feeders supply approximately 20% of the FEA's customer base. In the 12 to 18 months since the commissioning, more than 500 network faults have been registered and successfully restored beyond the recloser installation, with two recloser units accounting for more than 150 of these alone. Previously, an oil circuit breaker rated for 50 operations was used to protect the nearby substation and distribution feeders. The two NOJA Power OSM Recloser units now installed at the location of the circuit breaker are rated for over 30,000 operations and have performed 150+ operations in the 18-month period since commissioning, representing a substantial decrease in maintenance time and an increase in customer power supply.
机译:随着对斐济电力管理局(FEA)客户群的高可靠性电源需求的增加,FEA购买了最初的20台OSM重合器,主要安装在几个配电馈线的农村支线上。这些馈线的电路暴露时间超过1000公里(621英里),可为FEA客户群提供约20%的电力。自投产以来的12到18个月内,已经记录了500多个网络故障,并成功地将故障恢复到了重合器安装之后,其中两个重合器单元仅占其中的150多个。以前,使用额定运行50次的机油断路器来保护附近的变电站和配电馈线。现已安装在断路器位置的两台NOJA Power OSM重合闸单元的额定运行次数超过30,000次,自投产以来的18个月内已经执行了150多次运行,这意味着维护时间大大减少,客户功率增加了供应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号