I HAVE TO GET SOMETHING OFF MY CHEST. I've managed to work myself up over the issue of maximum wind loading for the design of transmission lines, and the unsettling thought of putting too much reliance on the calculation of return period events. But before we start redesigning lines, we need to know what wind issues we face.
展开▼