KOREA'S FIRST 765-KV DOUBLE-CIRCUIT LINE: KEPCO commissions installation to meet expansive load growth

机译:韩国首条765 KV双回路生产线:KEPCO委托安装以满足不断增长的负荷增长

获取原文
获取原文并翻译 | 示例
       

摘要

The peak demand on Korea's transmission system in 2004 was 51,264 MW, and the average annual increase in demand is about 8% per annum. The long-term load forecasts indicate that by 2021 there will be a power-delivery deficit of some 16,000 MW in the metropolitan area of Seoul City, Korea.
机译:2004年,韩国输电系统的峰值需求为51,264兆瓦,年均需求增长约为8%。长期负荷预测表明,到2021年,韩国首尔市都会出现约16,000兆瓦的电力输送赤字。