The peak demand on Korea's transmission system in 2004 was 51,264 MW, and the average annual increase in demand is about 8% per annum. The long-term load forecasts indicate that by 2021 there will be a power-delivery deficit of some 16,000 MW in the metropolitan area of Seoul City, Korea.
展开▼