...
首页> 外文期刊>The TEX Report >Nippon Steel, Sumitomo Metals, Kobelco To Forge Stronger Alliance
【24h】

Nippon Steel, Sumitomo Metals, Kobelco To Forge Stronger Alliance

机译:新日铁,住友金属,神钢打造更强大的联盟

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Nippon Steel Corp (NSC), Sumitomo Metal Industries, Ltd (Sumitomo Metals) and Kobe Steel Ltd (Kobelco) announced that they have agreed to strengthen and expand the current tripartite alliance to the following effect: [Three allied parties to expand joint use of iron- and steel-making facilities at Sumitomo Metals' Wakayama Steel Works as a source of steel slabs for processing into high grade steel] Sumitomo Metals has decided on basic policies relating to the construction of a new No. 2 Blast Furnace (BF) at its Wakayama Steel Works, with a view to bringing the new furnace on stream in the second half of the fiscal year ending March 31, 2013. This project involves renewal of the current No. 5 BF (to be renamed new No. 2 BF), as well as expansion of steel-making facilities among others measures. It follows the Company's decision to build a new No. 1 BF (renewal and renaming of the current No. 4 BF) at Wakayama Steel Works, which is scheduled to come on stream in June 2009.
机译:新日铁公司(NSC),住友金属工业有限公司(Sumitomo Metals)和神户钢铁有限公司(Kobelco)宣布,他们已同意加强和扩大目前的三方联盟,以达到以下效果:[三个同盟国扩大了共同使用住友金属和歌山钢铁厂的炼钢和炼钢设施,作为加工成高等级钢的钢坯的来源]住友金属已经决定了与建造新的2号高炉有关的基本政策。其和歌山钢铁厂,目的是在截至2013年3月31日的下一个财政年度的下半年将新炉投入生产。该项目涉及对当前的5号高炉进行更新(将改名为新的2号高炉)。以及扩建炼钢设施等措施。这是公司决定在和歌山钢铁厂建造新的1号高炉(对现有4号高炉进行更新和更名)的决定,该厂计划于2009年6月投产。

著录项

  • 来源
    《The TEX Report》 |2007年第9359期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号