...
首页> 外文期刊>The Zimbabwe Engineer >Commissioning of 1,8 billion dollars Hartley Platinum Mine begins
【24h】

Commissioning of 1,8 billion dollars Hartley Platinum Mine begins

机译:哈特利18亿美元铂金矿开始投产

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

According to Rule, there are two other 'pods' running along the Great Dyke which are currently being evaluated by the two companies. Delta and BHP are jointly assessing the Mhondoro deposit whilst Delta, on its own, is looking at the Ngezi deposit. Given that these exploration programmes are still at an early stage, Rule believes that "platinum production from Zimbabwe could conceivably be as much as 0,75 Moz within the next 10 years",
机译:根据Rule的说法,大堤上还有另外两个“豆荚”,这两家公司目前正在对其进行评估。达美航空和必和必拓正在联合评估Mhondoro矿床,而达美航空则独自评估了Ngezi矿床。鉴于这些勘探计划仍处于初期阶段,Rule认为“在未来10年内,津巴布韦的铂金产量可能会高达0.75 Moz”,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号