首页> 外文期刊>The tube & pipe journal >Improving flying cutoff operations, mill productivity
【24h】

Improving flying cutoff operations, mill productivity

机译:改善飞行中断操作,提高工厂生产率

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Making tube or pipe is anything but easy. During a typical shift, the mill operator has to keep an eye on a dozen variables and make scores of decisions to keep the mill running at maximum productivity. Most of the focus is on big-picture items like line speed and weld heat to make sure the line is running as fast as possible and inline inspection results to verify that the mill is making salable product. However, many details come into play too. How are the bearings holding up? Are the rolls still in good condition? Is the scarf bin filling up again? How long has it been since I changed the scarfing tool? Why is the cutoff saw making that noise?
机译:制造管子并非易事。在典型的轮班中,轧机操作员必须密切注意十几个变量并做出许多决策,以使轧机以最大的生产率运行。重点主要放在生产线速度和焊接热等大项目上,以确保生产线尽可能快地运行,并通过在线检查结果来验证轧机在生产可销售的产品。但是,许多细节也起作用。轴承如何支撑?面包卷是否仍处于良好状态?围巾箱再次充满吗?自更换围巾工具以来已有多长时间了?为什么截断锯会发出这种声音?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号