...
首页> 外文期刊>The Plant Engineer: The Journal of the Institution of Plant Engineers >No pipe dream: Lifting and handling issues take on new proportions when the materials to be moved are oil and gas pipelines. Tom Shelley reports
【24h】

No pipe dream: Lifting and handling issues take on new proportions when the materials to be moved are oil and gas pipelines. Tom Shelley reports

机译:梦想成真:当要运输的材料是石油和天然气管道时,举升和搬运问题将面临新的挑战。汤姆·雪莱报道

获取原文
获取原文并翻译 | 示例
           

摘要

Oil and gas pipelines could be built at up to five times the rate they are at present. This could be achieved with trains of tracked vehicles up to half a kilometre long, supported in remote and inaccessible areas by airships with lifting capacities of up to 300 tonnes. A fraction of the number of people would need to be accommodated on site and construction costs could be cut by up to 30%. While the development effort is global, the lead and much of the cleverest parts of the technology are British -and on a scale that Brunei would have beep proud of if he could have been around to take part in it.
机译:石油和天然气管道的建设速度可能是目前的五倍。这可以通过长达半公里的履带车辆的列车来实现,这些列车在起重能力不超过300吨的飞艇的支持下,在偏远和人迹罕至的地区得到支持。只有一小部分人需要在现场安置,并且可以将建筑成本削减多达30%。尽管开发工作是全球性的,但这项技术的领先者和许多最聪明的部分都是英国人,如果汶莱能够参加这项技术,那么文莱将为之感到骄傲。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号