首页> 外文期刊>The Royal engineers journal >Bridging to Stabilisation: Can the success of the Sobaat Bridge in Afghanistan be repeated to stabilise volatile areas and encourage growth in the local economy?
【24h】

Bridging to Stabilisation: Can the success of the Sobaat Bridge in Afghanistan be repeated to stabilise volatile areas and encourage growth in the local economy?

机译:通往稳定的桥梁:能否重复阿富汗索巴特大桥的成功来稳定动荡地区并鼓励当地经济增长?

获取原文
获取原文并翻译 | 示例
           

摘要

IN August 2010, 4 Armoured Engineering Squadron, 21 Engineer Regiment, constructed and opened for the Afghan public the Pul Sobaat (Stabilization) Bridge. The construction of the crossing replaced the existing bridge, which was not strong enough for military transport, lay below the flood level and which was rapidly losing its abutments to erosion. This construction provided many advantages, which significantly will bring stabilisation to the immediate area.
机译:2010年8月,第21工兵团第4装甲工程中队建造并向阿富汗民众开放了Pul Sobaat(稳定化)桥。该过境点的建设取代了现有的桥梁,该桥梁的强度不足以进行军事运输,位于洪水位以下,并且迅速失去了对侵蚀的支护。这种构造提供了许多优点,这将显着为附近地区带来稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号