首页> 外文期刊>The Mining Record >Stillwater Plans For Two Resource Development Projects
【24h】

Stillwater Plans For Two Resource Development Projects

机译:斯蒂尔沃特计划进行两个资源开发项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Stillwater Mining Company plans to proceed with two mine resource delineation and development projects along the Stillwater Complex: the Graham Creek Project, immediately to the west of the Company's East Boulder Mine, and the Blitz Project, immediately to the east of the Company's Stillwater Mine. Both projects lie within the boundaries of existing mining permits, and each would initially be serviced from existing mine infrastructure. Based on indications from historical surface delineation drilling in these areas, both proposed projects are viewed by the Company as having a high probability of ultimately adding significantly to the Company's probable PGM reserves.
机译:斯蒂尔沃特矿业公司计划沿斯蒂尔沃特综合体继续进行两个矿产资源划定和开发项目:紧靠公司东博尔德矿山西侧的Graham Creek项目和紧靠公司斯蒂尔沃特矿山东侧的闪电战项目。这两个项目都在现有采矿许可证的范围内,并且每个项目最初都将由现有矿山基础设施提供服务。根据这些地区的历史性表面划界钻探的迹象,公司认为这两个提议的项目极有可能最终显着增加公司的可能的PGM储量。

著录项

  • 来源
    《The Mining Record》 |2010年第12期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号