...
首页> 外文期刊>The Mining Record >Installation Of A Permanent SAG Mill Pre-Crusher
【24h】

Installation Of A Permanent SAG Mill Pre-Crusher

机译:安装永久性SAG粉碎机预破碎机

获取原文
获取原文并翻译 | 示例
           

摘要

Jim O'Rourke, President and CEO of Copper Mountain Mining, reported "Although SAG Mill throughput has challenged us longer than we anticipated following the start-up period, we are confident that recently implemented modifications will provide short term improvements while the longer term solutions are implemented.. We are cash flow positive and we will be continuing to improve the operation at the Copper Mountain mine, British Columbia, as we increase the amount of minus 2 inch ore in the SAG Mill feed that will allow us to meet our production goals".
机译:Copper Mountain Mining总裁兼首席执行官Jim O'Rourke表示:“尽管SAG Mill的吞吐量对我们的挑战时间超过了启动后的预期,但我们相信,最近实施的修改将为短期的改进提供长期的解决方案我们的现金流量为正,我们将继续提高不列颠哥伦比亚省铜山矿的运营,因为我们增加了SAG磨机进料中负2英寸的矿石量,这将使我们能够满足生产要求目标”。

著录项

  • 来源
    《The Mining Record》 |2013年第9期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号