首页> 外文期刊>The Mining Record >Mines Management Reports Operating Results
【24h】

Mines Management Reports Operating Results

机译:矿山管理报告经营成果

获取原文
获取原文并翻译 | 示例
           

摘要

Mines Management, Inc. reported results for the second quarter, 2009. In the second quarter of 2009, the Company: Completed the EIS public comment period June 29, 2009, with agencies currently compiling the data. Approved and adopted the Shareholders Rights Plan at the June 18, 2009 Annual Meeting of shareholders. Demobilized Small Mine Development, the adit rehabilitation contractor, on April 30, 2009 after installation and testing of the sumps for the water treatment system at the Montanore adit site. Maintained a strong cash and investment position at June 30, 2009, with 15.5 million dollars of unrestricted cash, availability under its line of credit, and unrestricted certificates of deposit.
机译:矿业管理公司(Mines Management,Inc.)报告了2009年第二季度的业绩。在2009年第二季度,公司:2009年6月29日完成了EIS公众意见征询期,有关机构目前正在汇总数据。在2009年6月18日的年度股东大会上批准并通过了《股东权利计划》。在蒙塔诺尔(Montanore)露天矿场安装并测试了水处理系统的储水罐之后,该矿场修复承包商的复员小型矿山开发公司于2009年4月30日复员。截至2009年6月30日,公司在现金和投资方面保持良好的实力,拥有1550万美元的无限制现金,信用额度和无限制存款证。

著录项

  • 来源
    《The Mining Record》 |2009年第10期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号