...
首页> 外文期刊>The Northern Miner. >Allied Gold plans growth in PNG
【24h】

Allied Gold plans growth in PNG

机译:联合黄金计划PNG增长

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Allied Gold (alg-t, ald-a) has big plans for its Simberi gold mine in Papua New Guinea (PNG) - the company has embarked on an expansion of the mine's oxide processing unit and now a prefeasibility study has shown that the mine could economically add a sulphide circuit to double its gold output. Allied Gold put Simberi into production in early 2008 and the oxide-only operation has been producing 72,000 oz. gold annually since. Each year the operation churns through 2 million tonnes of ore carrying an average grade of about 1 gram gold per tonne. In the last quarter, it cost Allied Gold 660 US dollars to produce an ounce of gold at Simberi.
机译:Allied Gold(alg-t,ald-a)在巴布亚新几内亚(PNG)的Simberi金矿有宏伟的计划-该公司已着手扩大该矿的氧化物处理装置,现在进行的可行性研究表明该矿可以在经济上增加硫化物回路,使其金产量翻倍。 Allied Gold于2008年初将Simberi投入生产,仅使用氧化物的方法就生产了72,000盎司。此后每年都有黄金。每年,该作业流经200万吨矿石,每吨矿石平均品位约为1克黄金。在上个季度,在辛贝里生产一盎司黄金的成本为联合黄金公司660美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号