...
首页> 外文期刊>The Northern Miner. >Augusta updates Rosemont feasibility
【24h】

Augusta updates Rosemont feasibility

机译:奥古斯塔更新罗斯蒙特的可行性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

An updated bankable feasibility study on the Rosemont copper-molybdenum project in Pima Cty., Ariz., has found that the proposed mine would have an after-tax net present value of 5 percent, or 1.28 billion US dollars, at a copper price of 1.85 US dollars per lb., Augusta Resource (AZC-T, AZC-X) reports. The study replaces a 2007 feasibility study on Augusta's 100 percent-owned Rosemont project and confirms that it is an "economically robust" open-pit copper-molybdenum mine with "low development risk," the Vancouver-based company said in a press release.
机译:亚利桑那州皮马市Rosemont铜钼项目的最新可投资可行性研究发现,拟建矿山的税后净现值为5%,即12.8亿美元,铜价为每磅1.85美元,奥古斯塔资源公司(AZC-T,AZC-X)报告。总部位于温哥华的公司在一份新闻稿中表示,该研究取代了奥古斯塔(Augusta)100%拥有的罗斯蒙特项目(Rosemont)的2007年可行性研究,并证实这是具有“低发展风险”的“经济强劲”露天铜钼矿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号