...
首页> 外文期刊>The Northern Miner. >CEO: Feasibility shows Arianne's Lac a Paul is a 'world-class
【24h】

CEO: Feasibility shows Arianne's Lac a Paul is a 'world-class

机译:首席执行官:可行性表明,阿里安的“ Lac a Paul”是世界一流的

获取原文
获取原文并翻译 | 示例

摘要

Arianne Phosphate's (TSXV: DAN; US-OTC: DRRSF) Lac a Paul phosphate-rock project in Quebec could be built for US$1.2 billion, a feasibility study shows. Of that amount, US$982.5 million (less US$73.9 million, set aside as contingency), would be spent building the mine and processing plant, and US$232.2 million (less a US$18.1-million contingency), would be spent building the transport system to move the product to the Port of Saguenay.
机译:可行性研究显示,Arianne Phosphate(TSXV:DAN; US-OTC:DRRSF)在魁北克省的一个Paul磷酸盐岩项目可能耗资12亿美元建造。其中,9.825亿美元(减去7390万美元,作为应急费用预留)将用于建设矿山和加工厂,2.322亿美元(减去1,810万美元的应急支出)将用于运输系统的建设。将产品移至萨格奈港。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号