...
首页> 外文期刊>The Northern Miner. >Aurizon reads between Casa Berardi mines
【24h】

Aurizon reads between Casa Berardi mines

机译:Aurizon在Casa Berardi矿山之间看书

获取原文
获取原文并翻译 | 示例
           

摘要

With two underground gold deposits actively being mined at the Casa Berardi project in northwestern Quebec, Aurizon Mines (arz-t, ark-n) recently completed a drill program to better understand the near-surface mineralization between them. The 12,800-metre drill program targeted the Crown Pillar area of the Principal zone, which lies roughly a kilometre east of the West production shaft and 3 km west of the East shaft. The drilling covered an area of 825 metres along strike, 250 metres in width and went 50 to 200 metres under-ground.
机译:在魁北克西北部的Casa Berardi项目中积极开采了两个地下金矿,Aurizon矿业公司(arz-t,ark-n)最近完成了一个钻探计划,以更好地了解它们之间的近地表矿化。这个长达12800米的钻探计划针对的是主要地区的皇冠柱地区,该地区位于西部生产井以东约1公里,而东部井以西约3公里。钻探沿走向覆盖了825米,宽250米,地下50至200米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号