...
首页> 外文期刊>The Northern Miner. >Wildfire hinders Capstone's expansion plans at Minto
【24h】

Wildfire hinders Capstone's expansion plans at Minto

机译:野火阻碍了Capstone在Minto的扩张计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Capstone Mining (cs-t) was forced to suspend operations at its Minto copper-gold mine in the Yukon, when an out-of-control forest fire came within 6 km of the mine, but a back burn around the mine perimeter allowed operations to restart on June 14. Nevertheless, the shutdown put a damper on recent news of plans to incorporate underground mining to extend Minto's lifespan. The fire started on May 30 when high winds blew a dead tree into contact with the spur line that supplies power to the mine. The fire spread quickly because the Yukon has been experiencing hot, dry weather with strong winds. Within a day, the fire covered 3 sq. km; 3 days after it started it had grown to 20 sq. km.
机译:Capstone Mining(cs-t)被迫中止其育空地区Minto铜金矿的开采,当时距矿山6公里以内发生失控的森林大火,但矿山周围的回火允许开采将于6月14日重新启动。尽管如此,停工对最近计划整合地下采矿以延长Minto使用寿命的消息有所打击。 5月30日,大风吹倒一棵枯树,使其与为矿井供电的支线接触,引发大火。由于育空地区一直处于炎热干燥的天气中,大风迅速蔓延开来。一天之内,大火覆盖了3平方公里;开工三天后,面积已扩大到20平方公里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号