首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >Managing lean DRC systems with demand uncertainty: an analytical approach
【24h】

Managing lean DRC systems with demand uncertainty: an analytical approach

机译:在需求不确定的情况下管理精益DRC系统:一种分析方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper considers a dual resource constrained manufacturing system with identical parallel work cells, which operates in an environment with demand uncertainty. The system is evaluated under the principles of lean manufacturing: zero lead times, zero inventories, and zero defects. The study shows that group-dispatching rules and labor assignment policies have a significant impact on manufacturing productivity. By properly managing the changeover-per-unit output ratios and operator assignments, the available capacity for value adding activities is increased and manufacturing cost is reduced. Results of an experiment show that labor requirements can be reduced from 5% to 46% and, machine utilization can be reduced from 2% to 14%.
机译:本文考虑具有相同并行工作单元的双重资源受限制造系统,该系统在需求不确定的环境中运行。该系统根据精益生产的原则进行评估:提前期为零,库存为零,缺陷为零。研究表明,小组派遣规则和劳力分配政策对制造业生产率具有重大影响。通过适当地管理每单位转换的输出比率和操作员分配,可以增加增值活动的可用能力并降低制造成本。实验结果表明,劳动力需求可以从5%降低到46%,机器利用率可以从2%降低到14%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号