首页> 外文期刊>The Asia Miner >Aohanqi plant expansion under way
【24h】

Aohanqi plant expansion under way

机译:AO寒气plant expansion underway

获取原文
获取原文并翻译 | 示例
           

摘要

SINO Prosper State Gold Resources Holdings has started work on an expansion of processing plant capacity at the Aohanqi Gold Project in Inner Mongolia which will see daily capacity increased from 500 to 2000 tonnes. Some of the required equipment has been ordered prior to work commencing although Sino Prosper says planned construction may be affected by the positive impact expected from recent signing of the Aohan Banner Regional Cooperation Agreement. The results of reviewing other available processing facilities and other available resources may influence Sino Prosper's plans.
机译:SINO Prosper State Gold Resources Holdings已着手扩大内蒙古敖汉旗金矿项目的加工厂产能,该工厂的日产能将从500吨增加到2000吨。尽管Prosper表示,计划的施工可能会受到最近签署的《奥汉旗地区合作协议》带来的积极影响,但一些必需的设备已在施工开始之前被订购。审查其他可用处理设施和其他可用资源的结果可能会影响Sino Prosper的计划。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号