首页> 外文期刊>The Asia Miner >Resource drilling completed at Mutooroo
【24h】

Resource drilling completed at Mutooroo

机译:Mutooroo完成资源钻探

获取原文
获取原文并翻译 | 示例
           

摘要

INITIAL resource drilling has been completed at Minotaur Resources' Mutooroo Magnetite Project in South Australia's northeast. A total of 48 RC holes for 12,818 metres and 6 diamond drill holes for 1827 metres have been drilled on the Muster Dam magnetic target to nominal depths of 300 metres at 60 degree inclination. Laboratory assays, Davis Tube Recovery (DTR) and metallurgical test work are continuing with a formal resource based on recoverable magnetite expected to be estimated by the end of the year. Initial results confirm the mineralized widths and grades at the Muster target are consistent along the 6km strike length tested by drilling.
机译:在南澳大利亚州东北部的Minotaur Resources的Mutooroo磁铁矿项目中,INITIAL资源钻探已经完成。在60度倾斜度的Muster Dam磁性目标上,总共钻了48个RC孔(12,818米)和6个金刚石(1827米)孔至标称深度300米。实验室分析,戴维斯管回收(DTR)和冶金测试工作仍在继续进行,其正式资源基于可回收磁铁矿,预计在年底之前进行估算。初步结果证实,Muster目标的矿化宽度和品位在通过钻孔测试的6 km走向长度上是一致的。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号