首页> 外文期刊>Test Engineering & Management >Deviating from a well-organized plan can exact a heavy price
【24h】

Deviating from a well-organized plan can exact a heavy price

机译:偏离组织良好的计划可能会付出沉重的代价

获取原文
获取原文并翻译 | 示例
       

摘要

We working at Sandia National Labs, I was tasked to manage the development of an extremely critical test item. This item was to become the central portion of a quality assurance system for a fusing component required by a strategic weapon program. Our corporate partner was Bendix Kansas City (now Honeywell). Bendix staff assumed many associated system responsibilities. The aforementioned test item was a precision centrifuge needed to provide quantifiable accelerations to accuracy requirements never before achieved. At the programmatic level, the performance requirements assigned to the centrifuge had previously been evaluated. This evaluation identified the centrifuge as the single item most likely to delay or void the weapon program.
机译:我们在桑迪亚国家实验室工作,我受命管理一个极其关键的测试项目的开发。该项目将成为战略武器计划所需的融合部件质量保证体系的核心部分。我们的合作伙伴是堪萨斯州本迪克斯市(现霍尼韦尔)。 Bendix员工承担了许多相关的系统责任。前面提到的测试项目是一种精密离心机,需要提供可量化的加速度以达到前所未有的精度要求。在程序级别,先前已经评估了分配给离心机的性能要求。该评估将离心机确定为最有可能延迟或使武器计划无效的单一项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号