...
首页> 外文期刊>Pure and Applied Mathematika Sciences >ON EQUIVALENT JOB-BLOCK WEIGHTED SCHEDULING PROBLEM
【24h】

ON EQUIVALENT JOB-BLOCK WEIGHTED SCHEDULING PROBLEM

机译:等价的作业块加权调度问题

获取原文
获取原文并翻译 | 示例

摘要

All the prior studies in scheduling theory do not consider weight factor in the process of scheduling products on machines in a flow-shop. Only in the recent eighties the weight of a job has been taken into consideration by Miyazaki in 1980 and in 1982 by Maggu etc. in their respective studies with different approaches. The weight of a job shows relative importance of that job over another job in the scheduling process and thereby in loose sense it may be treated as fixing up priority of a job over another job by attaching to a job attaching higher weight. The higher the weight is attached to a job the more important it becomes from operational point of view.
机译:调度理论中的所有现有研究都没有在流水车间中的机器上调度产品的过程中考虑重量因素。宫崎骏分别在1980年和1982年由Maggu等人在各自的研究中以不同的方法考虑了工作的重要性。作业的权重显示了该作业在调度过程中相对于另一作业的相对重要性,因此,从广义上讲,可以通过将其附加到附加较高权重的作业来将其视为固定作业相对于另一作业的优先级。从操作的角度来看,对工作的重视程度越高,就越重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号