首页> 外文期刊>TEX Energy Report >India's Essar Oil Completes Optimisation Project 4 Months Ahead Of Schedule
【24h】

India's Essar Oil Completes Optimisation Project 4 Months Ahead Of Schedule

机译:印度的Essar Oil比计划提前四个月完成优化项目

获取原文
获取原文并翻译 | 示例
           

摘要

India's second largest private oil refiner Essar Oil Limited recently announced that it completed its Optimisation Project at Vadinar refinery four months ahead of the original schedule. The project is to further raise refining capacity of the refinery up to 405,000 barrels per day, which had been increased from 300,000 bpd to 375,000 bpd by the end of this March. The company has shown its plan that the project will be completed by the end of this September.
机译:印度第二大私营炼油厂Essar Oil Limited最近宣布,它比原定计划提前了四个月在Vadinar炼油厂完成了优化项目。该项目将进一步提高炼油厂的每日炼油能力至405,000桶,到3月底已从300,000桶/日提高到375,000桶/日。该公司已表明其计划,该项目将于今年9月底完成。

著录项

  • 来源
    《TEX Energy Report》 |2012年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号