首页> 外文期刊>TEX Energy Report >Coal Production At Bharinto Mine In Indonesia Postponed-Operation at 2 new coal mines to be started in 2011-
【24h】

Coal Production At Bharinto Mine In Indonesia Postponed-Operation at 2 new coal mines to be started in 2011-

机译:印度尼西亚巴林托煤矿的煤炭生产推迟了,两个新煤矿的运营将于2011年开始,

获取原文
获取原文并翻译 | 示例
           

摘要

Coal production at Bharinto coal mine in East Kalimantan, a new concession of thermal coal in Indonesia was postponed and will be started half a year later. According to Banpu Plc of Thailand, the supplier of Bharinto coal mine, the postponement is due to the delay in approval and license and coal output is expected to start in the middle of 2011. Bharinto mine is located adjacent to the south mining area of Trubaindo coal mine. The production of high quality thermal coal with low-ash, low-sulphur content and high calorific value (6700 kcal/kg on GAD) is expected. Coal production is estimated 4 million MT per year in full scale operation. Almost full volume of produced coal seems to be bound for export.
机译:东加里曼丹省Bharinto煤矿的煤炭生产(印尼的新动力煤特许权)被推迟,并将于半年后开始。根据Bharinto煤矿供应商泰国的Banpu Plc的说法,推迟是由于审批和执照的延迟,预计煤炭产量将于2011年年中开始。Bharinto矿位于Trubaindo南部矿区附近煤矿。预计将生产具有低灰分,低硫含量和高热值(GAD为6700 kcal / kg)的优质动力煤。全面运营后,预计每年煤炭产量为400万吨。几乎全部量的生产煤炭似乎都必须出口。

著录项

  • 来源
    《TEX Energy Report》 |2010年第18期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号